News & Coverage
Commentary & Writers
Local coverage. Independent commentary. Republican perspectives.Explore all news →

Oh, Baltimore Brew. Never change. You’ve somehow managed to publish two stories in the same universe where the city can mobilize grief counselors for nine red oaks but needs another 16 years to stop sending surprise “poop smoothies” into the Jones Falls like it’s a seasonal craft beverage.
Let’s start with the tree melodrama. Baltimore Brew reports that Johns Hopkins cut down nine mature city-owned Northern Red Oaks on Remington Avenue for its Data Science and AI Institute project, despite months of protests, a petition with 2,000+ signatures, and even a last-minute cease-and-desist letter.
And the scene? Pure theater. Residents gathering like it’s the finale of a prestige HBO miniseries: chainsaws whining, tears glistening, someone reading Wendell Berry like the trees are about to be tried at The Hague.
Look, I’m not here to dunk on people who like trees. Trees are great. Shade. Oxygen. Leaves that do that nice crunchy thing in the fall. But Baltimore has mastered the art of “activism selection.” We can get a neighborhood Red Oak Emergency Response Team assembled in 48 hours, but the sewer system. That’s like asking Baltimore to build a Mars colony with paper straws and a feelings-based budget.
Because while the city is busy holding candlelight vigils for stumps, Baltimore Brew reports the city’s sewer consent decree timeline is now basically: “See you in 2046, maybe.”
Yes, you read that right: the city is talking about sewer projects finishing as late as December 31, 2046.
Which means the “solution” to sewage overflows is to simply outlive everyone who remembers the problem.
And here’s the funniest part: this whole saga traces back to a court order/consent decree going all the way back to 2002, with a deadline that was originally supposed to be 2016, then pushed to 2030, and now, drumroll, 2046.
Baltimore has been “working on it” so long that the sewage itself qualifies for a pension.
The Brew notes that even after some smaller overflows were addressed, the big structures are still dumping during storms, outfalls feeding the lower Jones Falls and another discharge point into Herring Run, plus ongoing system issues tied to the Stony Run Pump Station.
And collectively, those major outfalls released more than 78 million gallons of untreated sewage between 2023 and 2025, per DPW records cited by the Brew.
Seventy-eight million gallons! That’s not a “spill.” That’s a recurring Baltimore tradition. Put it on a flag. “Maryland: Freedom, Crab Cakes, and Periodic Sewer Volcanoes.”
So yes: from 2002 to now, we will absolutely get to Mars and make first contact before Baltimore stops seasoning local waterways with E. coli. At this point, the first message from the aliens won’t be “We come in peace.” It’ll be: “Why does your Inner Harbor smell like a haunted aquarium?”
And speaking of haunted logic, can we take a second to salute the Maryland Comptroller, who, back when she was in the State House (as then-Del. Brooke Lierman), gave us one of the most Baltimore sentences ever assembled: the idea that planting trees is tied to reducing crime.
Now, I’m not saying trees don’t do good things. But the way it gets thrown around in local political lore is like: “Don’t worry about carjackings, guys just plant an oak. Criminal sees oak, drops Glock, starts journaling. Turns life around. Becomes a park ranger.”
Meanwhile, in the real Baltimore Extended Universe, we can’t stop raw sewage from showing up in basements and streams on a regular schedule but sure tell me again how the maple is going to tackle violent crime. Maybe the tree can also run the Department of Public Works. Give it a little badge. “Officer Spruce, you’re on overflow duty.”
This is what kills me about the “tree hugger vs. evil chainsaw” framing. You’ve got protest energy strong enough to power the entire AI institute poetry readings, petitions, outrage, surveillance-state vibes, the whole festival lineup.
But where’s the same performative intensity for the sewer timeline? Where are the interpretive dance routines outside the pump station? Where is the spoken-word piece titled “Outfall 67: A Love Story”?
Because Baltimore’s priorities are basically:
And don’t get me wrong, I’m glad the Brew is covering the sewer mess. They even note DPW plans, such as cleaning and rehabilitating parts of the system in the 2026–2029 window, with some targeted elimination goals by 2030, while other capacity projects slide into the mid-to-late 2030s and beyond.
But the headline reality remains: Baltimore is the only place where the future is a public-health hazard and the present is a press release.
So here’s my humble proposal as Ian Schwartz, your official tour guide through the slapstick carnival:
Let’s combine the movements.
Next protest, don’t chain yourself to the tree; chain yourself to Outfall 67. Read poetry directly into the stink cloud. Livestream the “hydraulic limitations.” Bring a petition titled “STOP THE RAIN FROM EXISTING.” If Hopkins can get called out for transparency, let’s ask DPW to explain why the city’s best plan is “wait until your kids are middle-aged.”
Because if Baltimore can stage a full emotional production for nine trees, it can at least try to stop treating its waterways like a toilet that accidentally got upgraded to “historic charm.”
Ian Schwartz is a columnist for Direct Line Contact at Ian.Schwartz@mcgopclub.com
Direct Line News is a Maryland-based free-access publication committed to the Republican reform tradition.